02 — How a job runs
Five stages, and you see the cost at the second.
The order matters. A number that arrives after the work is committed is an invoice, not an estimate — so the priced schedule comes second, before anything is bought.
Brief and site visit
Floor area, occupancy, what the space has to do. Measured rather than assumed — floor area drives every number that follows.
Preliminary estimate
A schedule of items with rates, a subtotal, VAT and contingency stated separately, and a clear note on what is indicative and what is committed.
Specification and quotes
Product selections agreed against the estimate, then real supplier quotations sought to replace the indicative rates.
Supply and install
Procurement, delivery and installation managed as one job, so nobody is chasing three vendors to find out where the flooring is.
Handover
The space handed over finished, with what was supplied documented against what was quoted.
03 — On estimates
What you are holding at stage two.
A schedule of items with rates, a subtotal, VAT and contingency each shown separately, and the floor area every calculation rests on stated on the page.
04 — Contact
Tell us the space and we will tell you the number.
Floor area, how many people it has to hold, and what condition it is in now is enough to start. If you have a drawing, better.