02 — How a job runs

Five stages, and you see the cost at the second.

The order matters. A number that arrives after the work is committed is an invoice, not an estimate — so the priced schedule comes second, before anything is bought.

02.1

Brief and site visit

Floor area, occupancy, what the space has to do. Measured rather than assumed — floor area drives every number that follows.

02.2

Preliminary estimate

A schedule of items with rates, a subtotal, VAT and contingency stated separately, and a clear note on what is indicative and what is committed.

02.3

Specification and quotes

Product selections agreed against the estimate, then real supplier quotations sought to replace the indicative rates.

02.4

Supply and install

Procurement, delivery and installation managed as one job, so nobody is chasing three vendors to find out where the flooring is.

02.5

Handover

The space handed over finished, with what was supplied documented against what was quoted.

03 — On estimates

What you are holding at stage two.

A schedule of items with rates, a subtotal, VAT and contingency each shown separately, and the floor area every calculation rests on stated on the page.

What our estimates state →

04 — Contact

Tell us the space and we will tell you the number.

Floor area, how many people it has to hold, and what condition it is in now is enough to start. If you have a drawing, better.

Email
[email protected]
Phone / WhatsApp
+234 913 333 3687
Registration
RC 9000967
Location
Lagos, Nigeria